
ERIC Number: EJ217067
Record Type: Journal
Publication Date: 1979-Sep
Pages: N/A
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Matching and Maximizing in Concurrent Schedules.
Heyman, Gene M.
Psychological Review, v86 n5 p496-500 Sep 1979
Staddon and Motheral derived a mathematical model of responding in concurrent variable-interval--variable-interval schedules. Their derivation ignores a fundamental aspect of the concurrent schedule contingency. A reinforcer can occur following two consecutive responses on the same schedule or following a switch between the two schedules. Implications are discussed. (Author/RD)
Publication Type: Journal Articles; Reports - Research; Information Analyses
Education Level: N/A
Audience: N/A
Language: English
Sponsor: N/A
Authoring Institution: N/A
Grant or Contract Numbers: N/A
Author Affiliations: N/A