NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: ED199539
Record Type: RIE
Publication Date: 1980-Dec
Pages: 28
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Production Scheduling for Rehabilitation Workshops.
Hietala, David A.
This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling procedure presented in this manual has been designed to meet workshop requirements for a production schedule that takes client performance levels, varying work hours, and other factors into account. The guide has two practitioner-oriented goals: to enhance the user's understanding of production scheduling, and to provide the user with basic methods for performing production scheduling in the sheltered workshop. Sample production schedules are included. (KC)
Materials Development Center, Stout Vocational Rehabilitation Institute, University of Wisconsin-Stout, Menomonie, WI 54751 ($2.00).
Publication Type: Guides - Non-Classroom
Education Level: N/A
Audience: N/A
Language: English
Sponsor: National Inst. of Handicapped Research (ED), Washington, DC.
Authoring Institution: Wisconsin Univ.-Stout, Menomonie. Stout Vocational Rehabilitation Inst.
Grant or Contract Numbers: N/A
Author Affiliations: N/A