NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: ED052869
Record Type: Non-Journal
Publication Date: 1970-Jan
Pages: 69
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Snowflake Union High School District No. 60: Second High School Feasibility Study. Report of Survey.
Arizona State Univ., Tempe. Bureau of Educational Research and Services.; Arizona State Univ., Tempe. Coll. of Education.
The report of the feasibility study for construction of a second high school in the Snowflake Union High School District includes discussions of student population data, educational factors, high cost factors for school operations, the educational planning process, and second high school plant facility needs. Based on outcomes of the feasibility study, it is recommended to the Board of Education that a second high school be built, opening in September, 1973. Four problem areas--legal problems related to bonding, rising construction costs, high interest rates, and adequacy of enrollment--are also discussed, and recommendations relevant to each area are offered. (JB)
Bureau of Educational Research and Services, College of Education, Arizona State University, Tempe, Arizona 85281 ($2.00)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: N/A
Authoring Institution: Arizona State Univ., Tempe. Bureau of Educational Research and Services.; Arizona State Univ., Tempe. Coll. of Education.
Identifiers - Location: Arizona
Grant or Contract Numbers: N/A
Author Affiliations: N/A