ERIC Number: ED036091
Record Type: RIE
Publication Date: 1969-Nov
Pages: 8
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Decentralized Modular Systems Versus Centralized Systems.
Crossey, R. E.
Building design, planning, and construction programing for modular decentralized mechanical building systems are outlined in terms of costs, performance, expansion and flexibility. Design strategy, approach, and guidelines for implementing such systems for buildings are suggested, with emphasis on mechanical equipment and building element repetition. The technological gaps are overviewed between building design and the construction and building industries. (TG)
Descriptors: Building Design, Building Systems, Construction Needs, Costs, Design Requirements, Equipment, Equipment Manufacturers, Flexible Facilities, Mechanical Design Technicians, Mechanical Equipment, Modular Building Design, Performance Specifications, Planning, Structural Building Systems, Structural Elements (Construction)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: N/A
Authoring Institution: N/A
Grant or Contract Numbers: N/A
Author Affiliations: N/A
Note: Speech presented at Colleges of Applied Arts and Technology Design Workshop, Ottawa, Nov. 18, 1969