American School and University, 1976
Systems building worked well for Boston's ambitious program, but the project manager tells why he thinks it won't work elsewhere. (Author)
Descriptors: Construction Management, Construction Programs, Cost Effectiveness, Elementary Secondary Education
Lee, Todd – American School and University, 1973
A systems design specialist discusses where systems built schools are going. (Author)
Descriptors: Construction Management, Fast Track Scheduling, Flexible Facilities, Performance Specifications
Peer reviewed Peer reviewed
Planning for Higher Education, 1972
College planners turned to the use of systems building, fast-track planning, and construction management to produce a 1,000-student, first-phase campus in 20 months. (Author)
Descriptors: Campus Planning, Construction Costs, Construction Management, Cost Effectiveness
Peer reviewed Peer reviewed
King, Jonathan – National Elementary Principal, 1972
New developments in the building industry meet the cost-time-quality challenge. (Author)
Descriptors: Construction Management, Cost Effectiveness, Educational Facilities Design, Facility Planning
Featherstone, Richard L. – 1972
The Construction Systems Program (CSP) is the management process utilized in the construction of additions to four schools in the Detroit School District. The objectives of CSP were (1) to reduce the time required to plan and construct new buildings and additions, (2) to reduce the cost of new buildings and additions, and (3) to maintain or…
Descriptors: Architects, Bids, Building Systems, Construction Costs
Detroit Public Schools, MI. – 1970
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate…
Descriptors: Architects, Bids, Building Systems, Construction Management
King, Johathan; Carter, Donn – American School and University, 1974
An award-winning facility that is a superior expression of the latest in construction techniques -- techniques that are paring away at wastes in construction time and money, while maintaining structural quality. A related article is EA 504 766 (American School and University; v46 n7 Mar '74.) (Author)
Descriptors: Awards, Building Systems, Construction Management, Cost Effectiveness
Peer reviewed Peer reviewed
Planning for Higher Education, 1972
Discusses how three major innovations in planning and constuction--the use of systems components, fast-track planning, and construction management--were used in the design and construction of two new technical schools in only nine months. (Author/DN)
Descriptors: Building Innovation, Building Systems, Construction (Process), Construction Management
Dell' Isola, A. J. – 1972
There have recently been a number of new concepts introduced into the building industry to reduce building costs. In this speech, the author illustrates how three of these new concepts -- construction management, building systems, and value engineering -- can be combined to effect significant reduction in both the initial and the ownership costs…
Descriptors: Bids, Building Systems, Construction Costs, Construction Management
Baas, Alan M. – 1973
Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors.…
Descriptors: Architectural Programing, Building Systems, Construction Costs, Construction Management
Cleland, Wallace B., Ed. – 1975
This study is focused on organizational and procedural aspects of the Construction Systems Program (CSP), a developmental/demonstration project. The report is derived principally from practical observations by 42 active participants (architects, engineers, contractors, construction managers, owner's staff) in a four-school pilot program. Also…
Descriptors: Bids, Building Systems, Construction Costs, Construction Management
New Jersey State Dept. of Higher Education, Trenton. – 1972
The major special feature of a planned college building is the application of Academic Building System (ABS) planning concepts to the building design and construction. The primary feature of this approach is total future flexibility of general academic space by use of movable and compatible subsystems. These subsystems appear in the form of…
Descriptors: Architectural Programing, Building Design, College Buildings, College Planning
Building Systems Information Clearinghouse, Menlo Park, CA. – 1973
The main article in this newsletter concerns the adoption by an architectural firm of elements of a systems approach as a means of providing school buildings responsive spatially and environmentally to educational change, and how these activities were later instrumental in facilitating entry by the architectural firm into the construction…
Descriptors: Architects, Architecture, Bids, Building Plans
North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education. – 1988
This guide is intended for use in teaching a course in construction systems. The course, which is intended for students in grades 9 and 10, examines construction technology in terms of a sequential process that includes the planning, building, and servicing of structures. The first two sections discuss the guide's development within the framework…
Descriptors: Behavioral Objectives, Building Systems, Construction Management, Construction (Process)