Descriptor
| Building Conversion | 3 |
| Construction Costs | 3 |
| Design Requirements | 3 |
| Facility Improvement | 3 |
| Facility Requirements | 3 |
| Building Design | 2 |
| Criteria | 2 |
| Environmental Standards | 2 |
| Facility Guidelines | 2 |
| Laboratories | 2 |
| Laboratory Safety | 2 |
| More ▼ | |
Source
Author
Publication Type
Education Level
Audience
Location
Laws, Policies, & Programs
Assessments and Surveys
What Works Clearinghouse Rating
Murphy, Levy and Wurman, Architects, Philadelphia, PA. – 1968
The Philadelphia Board of Education has begun to consider the purchase and conversion of commercial and industrial structures for use as teaching facilities. One such building, a six-story fireproof loft building, has been purchased for this purpose. This study investigates the possibilities and limitations of conversion and points up the…
Descriptors: Building Conversion, Building Plans, Construction Costs, Design Requirements
Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div. – 1966
Volume I of a two volume manual serves as an introduction to design criteria for microbiological facilities. It is addressed to management personnel responsible for planning, budgeting, and making policy decisions for construction or remodeling of microbiological research laboratories. This volume is also concerned with--(1) microbiological safety…
Descriptors: Accident Prevention, Building Conversion, Building Design, Construction Costs
Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div. – 1966
Volume II of a two-volume manual of design criteria, based primarily on biological safety considerations. It is prepared for the use of architect-engineers in designing new or modified microbiological facilities for Fort Detrick, Maryland. Volume II is divided into the following sections: (1) architectural, (2) heating, ventilating, and air…
Descriptors: Air Conditioning, Architecture, Building Conversion, Building Design


