Descriptor
| Construction Management | 13 |
| Cost Effectiveness | 13 |
| Systems Approach | 8 |
| Building Systems | 7 |
| Construction Costs | 6 |
| Construction Programs | 5 |
| Fast Track Scheduling | 5 |
| Systems Building | 5 |
| Facility Planning | 4 |
| School Construction | 4 |
| Bids | 3 |
| More ▼ | |
Source
| American School and University | 4 |
| American School & University | 1 |
| CEFP Journal | 1 |
| National Elementary Principal | 1 |
| Planning for Higher Education | 1 |
Author
| Belyea, Richard | 1 |
| Carter, Donn | 1 |
| Cleland, Wallace B., Ed. | 1 |
| Culver, Harold W. | 1 |
| Dell' Isola, A. J. | 1 |
| Featherstone, Richard L. | 1 |
| King, Johathan | 1 |
| King, Jonathan | 1 |
| Lillie, E. Thomas | 1 |
| Srivastava, R. D. | 1 |
Publication Type
| Journal Articles | 2 |
| Reports - Research | 2 |
| Guides - Non-Classroom | 1 |
| Reports - Descriptive | 1 |
Education Level
Audience
| Practitioners | 1 |
Location
| Alabama | 1 |
| India | 1 |
| Massachusetts (Boston) | 1 |
Laws, Policies, & Programs
Assessments and Surveys
What Works Clearinghouse Rating
American School and University, 1977
Efficient management and construction techniques enabled the district to economically complete ten schools that have different exteriors. (MLF)
Descriptors: Construction Management, Cost Effectiveness, Educational Facilities Design, Elementary Education
American School and University, 1976
Systems building worked well for Boston's ambitious program, but the project manager tells why he thinks it won't work elsewhere. (Author)
Descriptors: Construction Management, Construction Programs, Cost Effectiveness, Elementary Secondary Education
American School and University, 1973
An interview with the president of a construction management firm reveals how time and money can be saved through value engineering, scheduling, and cost control. (Author)
Descriptors: Construction Costs, Construction Management, Cost Effectiveness, Fast Track Scheduling
Peer reviewedPlanning for Higher Education, 1972
College planners turned to the use of systems building, fast-track planning, and construction management to produce a 1,000-student, first-phase campus in 20 months. (Author)
Descriptors: Campus Planning, Construction Costs, Construction Management, Cost Effectiveness
Peer reviewedKing, Jonathan – National Elementary Principal, 1972
New developments in the building industry meet the cost-time-quality challenge. (Author)
Descriptors: Construction Management, Cost Effectiveness, Educational Facilities Design, Facility Planning
Featherstone, Richard L. – 1972
The Construction Systems Program (CSP) is the management process utilized in the construction of additions to four schools in the Detroit School District. The objectives of CSP were (1) to reduce the time required to plan and construct new buildings and additions, (2) to reduce the cost of new buildings and additions, and (3) to maintain or…
Descriptors: Architects, Bids, Building Systems, Construction Costs
King, Johathan; Carter, Donn – American School and University, 1974
An award-winning facility that is a superior expression of the latest in construction techniques -- techniques that are paring away at wastes in construction time and money, while maintaining structural quality. A related article is EA 504 766 (American School and University; v46 n7 Mar '74.) (Author)
Descriptors: Awards, Building Systems, Construction Management, Cost Effectiveness
Peer reviewedCulver, Harold W.; Belyea, Richard – CEFP Journal, 1979
A construction management firm and the architects working with the firm provided San Diego with ten elementary schools that were delivered on schedule, within cost, and met or exceeded the basic design criteria. (Author/MLF)
Descriptors: Building Systems, Construction Management, Construction Programs, Cost Effectiveness
Lillie, E. Thomas – American School & University, 1997
Explores the use of a commissioning agent (CA) during school construction projects to ensure that all building systems work together and to specifications. The types of work done by a CA, the cost involved, and the overall benefits derived are outlined. (GR)
Descriptors: Building Systems, Construction Management, Cost Effectiveness, Educational Facilities Planning
Dell' Isola, A. J. – 1972
There have recently been a number of new concepts introduced into the building industry to reduce building costs. In this speech, the author illustrates how three of these new concepts -- construction management, building systems, and value engineering -- can be combined to effect significant reduction in both the initial and the ownership costs…
Descriptors: Bids, Building Systems, Construction Costs, Construction Management
Cleland, Wallace B., Ed. – 1975
This study is focused on organizational and procedural aspects of the Construction Systems Program (CSP), a developmental/demonstration project. The report is derived principally from practical observations by 42 active participants (architects, engineers, contractors, construction managers, owner's staff) in a four-school pilot program. Also…
Descriptors: Bids, Building Systems, Construction Costs, Construction Management
Srivastava, R. D. – 1974
The Central Building Research Institute (CBRI) is one of the national laboratories of India's Council of Scientific and Industrial Research. CBRI has applied the techniques of partial prefabrication to school building programs in Uttar Pradesh, the state having the largest population in India. The plan provides that the elements of a basic…
Descriptors: Building Plans, Building Systems, Case Studies, Construction Costs
New Jersey State Dept. of Higher Education, Trenton. – 1972
The major special feature of a planned college building is the application of Academic Building System (ABS) planning concepts to the building design and construction. The primary feature of this approach is total future flexibility of general academic space by use of movable and compatible subsystems. These subsystems appear in the form of…
Descriptors: Architectural Programing, Building Design, College Buildings, College Planning