NotesFAQContact Us
Collection
Advanced
Search Tips
Laws, Policies, & Programs
Assessments and Surveys
What Works Clearinghouse Rating
Showing 1 to 15 of 22 results Save | Export
Peer reviewed Peer reviewed
Barley, John McKim, II – CEFP Journal, 1986
Successful completion of a construction project requires the efforts of a team composed of the owner, architect, and contractor. A preconstruction conference can clarify the roles of the team as specified in the design contract. (MLF)
Descriptors: Architects, Construction Management, Construction Programs, Contracts
Sawyer, William C. – American School and University, 1971
The State University Construction Fund, utilizing the nation's top professional talents, must design by contract, within fixed budgets and strict time schedules, quality architecture for 32 campuses in New York State. (Author)
Descriptors: Building Design, Construction Programs, Contracts, Interior Design
American School and University, 1981
A new dormitory at Massachusetts Institute of Technology was constructed using a joint venture contract with safeguards and incentives that brought university, architect, and building contractor into a closer and more productive relationship than under conventional contract arrangements. (Author/MLF)
Descriptors: Architects, Construction Management, Construction Programs, Contracts
Johnson, Marvin R. A. – 1968
Topic coverage defines the interaction and relationships between school officials and professionals in the fields of design and planning. Preliminary discussion involves school function and educational planning, while the topic of architect choice considers--(1) professional role, (2) basic factual data, (3) selection methods, and (4) contracts…
Descriptors: Architects, Architectural Programing, Construction Programs, Contracts
Canty, Donald – 1968
Discussion of various aspects of the architect-client relationship and architectural duties and procedures is presented. The various stages of architect selection precede a discussion of services and fees. The problem solving process is detailed in terms of--(1) client influence, (2) decision making, and (3) preliminary stages. Preparation of…
Descriptors: Architects, Blueprints, Building Trades, Construction Costs
Batley, John R. – Independent School, 1977
All schools face the continuing challenge of getting the best possible assistance from those they hire to help solve building problems and carry out construction projects. An outline is discussed that describes a typical building construction project and the major elements in an effective contractual arrangement between school and contractor.…
Descriptors: Construction Costs, Construction Programs, Contracts, Guidelines
New York State Office of the Comptroller, Albany. Div. of Management Audit. – 1997
The purpose of this audit was to determine whether New York City's School Construction Authority (SCA) followed its required procedures for awarding and monitoring contracts for construction work in New York City schools. It evaluated the adequacy of these procedures and surveyed school officials to determine their views about SCA work. The report…
Descriptors: Construction Costs, Construction Management, Construction Programs, Contracts
Architectural Forum, 1971
New methods change design and speed construction. (Author)
Descriptors: Architecture, Building Design, Construction Programs, Contracts
Peer reviewed Peer reviewed
Smith, Patricia B. – CEFP Journal, 1986
Drafting insurance requirements in educational construction bid documents is a momentous task. Basic areas that must be addressed include worker's compensation, employers' liability, property insurance, motor vehicle liability, and public liability. Other coverages may be indicated for specific projects or locations. (MLF)
Descriptors: Construction Programs, Contracts, Court Litigation, Elementary Secondary Education
Consulting Engineers Council of the U.S., Washington, DC. – 1972
Changing times place new demands on those involved in the implementation of construction projects. Within a relatively few years, the size and complexity of projects has grown substantially. Environmental and other public and social considerations are increasingly significant. With growing complexity, the requirements for effective project…
Descriptors: Construction Management, Construction Programs, Consultants, Contracts
Garber, Lee O.; Seitz, Reynolds C. – Yearbook of School Law, 1971
Discusses legal problems relating to school property such as building construction authority, school property title, school building site acquisition, and school construction financing. (JF)
Descriptors: Boards of Education, Construction Programs, Contracts, Court Litigation
Hein, William H., Jr., Ed. – 1975
The working papers that document the planning, construction, equipping, and operation of a laboratory facility dedicated to educational research and development (R&D) are organized into three volumes. Volume I sets forth the technical substance of the 12 working papers. This volume, Volume III, contains the technical attachments for Working Papers…
Descriptors: Budgets, Construction Programs, Contracts, Documentation
Dibner, David R. – 1973
This booklet was conceived and developed in response to the many questions asked of the AIA about architects and architecture by those contemplating a construction project. Questions answered concern reasons for retaining an architect, selection of an architect, methods of paying an architect, client responsibility, the building design process,…
Descriptors: Architects, Architectural Character, Building Design, Construction Management
Peer reviewed Peer reviewed
Cole, Elsa Kircher; Goldblatt, Steven M. – Journal of College and University Law, 1989
The article describes the responsibilities of public colleges and universities to award construction contracts to the lowest responsible bidder; discusses the purpose of bid statutes; and lists the factors institutions should consider in determining a bidder's responsibility. Also covered are the standard of review and due process rights of the…
Descriptors: Bids, Buildings, Competition, Construction Costs
Hood, Diane M. – 1973
A previous report, Independent Schools Building Research Project (December 1972), on the current methods of building independent school facilities is summarized in this booklet. The summary is intended to increase the level of awareness of school administrators who are involved with building programs. Since survey results indicated that the…
Descriptors: Construction Costs, Construction Programs, Contracts, Cost Effectiveness
Previous Page | Next Page ยป
Pages: 1  |  2