Bareither, Harlan D. – CEFP Journal, 1981
Interior parts of educational buildings deteriorate or become obsolete as programs change and facilities get reassigned. Space realignment, renewal, and replacement (SR3) is a concept for budgeting the necessary funds to prevent deterioration of physical facilities. (Author/MLF)
Descriptors: Budgeting, Building Obsolescence, Building Systems, Cost Estimates
Peterson, Irving M., Ed.; Gates, Richard M., Ed. – 1980
The suggestions contained in this guide are intended to help reduce energy consumption in school facilities. Energy conservation measures are discussed on three levels: (1) the educational program and activities schedule, (2) operation of the facility and supporting systems, and (3) the physical plant. Discussed are high cost, medium cost, and low…
Descriptors: Building Systems, Cost Effectiveness, Educational Administration, Educational Facilities
National Electrical Contractors Association, Washington, DC. – 1979
Described in this guide for owners and managers of office buildings and small retail stores, is a program entitled Total Energy Management (TEM). The TEM program approach rests on the premise that buildings should be examined in terms of total energy consumption, rather than prescribing energy budgets for a building's separate systems. The…
Descriptors: Building Operation, Building Systems, Business Administration, Cost Effectiveness
Peer reviewed Peer reviewed
Culver, Harold W.; Belyea, Richard – CEFP Journal, 1979
A construction management firm and the architects working with the firm provided San Diego with ten elementary schools that were delivered on schedule, within cost, and met or exceeded the basic design criteria. (Author/MLF)
Descriptors: Building Systems, Construction Management, Construction Programs, Cost Effectiveness
Jurney, Douglas M. – School Business Affairs, 1979
A preengineered building has the advantages of factory production and computerized quality control. Insulation efficiency and a roofing system that enables the entire roof membrane to react a full two inches to any temperature-induced movement are two of the innovations of preengineered building research. (Author/MLF)
Descriptors: Building Innovation, Building Systems, Cost Effectiveness, Elementary Secondary Education
Mitchell, Eugene E., Ed.; Leventhal, Lance A. – 1979
Many devices and systems related to microprocessors are available on the marketplace. The author suggests that criteria for selecting and designing workstations and development systems are necessary. Seventeen important factors of designing workstations and six desirable features of a development system are presented. The kinds of places in which…
Descriptors: Building Systems, Computer Science Education, Computers, Criteria
General Electric Co., Philadelphia, PA. – 1977
The solar heating system is a retrofit installation on the roof of the Grover Cleveland Middle School in Boston. The system includes 4,600 square feet of flat plate collectors, a 2,000 gallon solar energy storage tank, plus the required structural steel, piping, insulation, pumps, heat exchangers, and controls to heat the air supplied by two…
Descriptors: Building Systems, Educational Facilities Improvement, Energy Conservation, Equipment Maintenance
Peer reviewed Peer reviewed
Kaiser, Harvey H. – CEFP Journal, 1984
Compares the life cycle approach for campus building repair and renovation to the University of California's comprehensive building maintenance formula and advises that formulas be used cautiously as a method of determining appropriate budget levels. (MLF)
Descriptors: Budgeting, Building Systems, Capital Outlay (for Fixed Assets), Construction Costs